Paint 253-1H switchgear exterior. …
Construction will paint the top of the Naval Reactor Core Barrel.…
Replace a door at building 701-3G (Barnwell Barricade).…
This activity will investigate the dissolution rate kinetics of metal oxides, with a particular focus on lanthanide oxides, in an organic solutions…
Construction will Demolition and Disposition Uninterruptible Power Supply (UPS), conduit and wiring connected to the following panels: breaker pane…
Groundwater recovery well RWM 6, piped to the M-1 Air Stripper, has been underperforming. Savannah River National Laboratory (SRNL) has been retain…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
The purpose of the CRC Project is to consolidate all monitoring and control functions from the F-Tank Farm control rooms to the 241-2H Control Room…
Upon demolition of control room panel as part of FCA, it was discovered that a section of the control panel was integrated into the main corridor h…
Replace Center Section Air Supply Fan 50 Pre-Heat steam coils (HCL 13 and 14) using specifications of existing coils, install drain from Supply Fan…