The activity is to perform up to 6 Seismic Cone Penetrometer Testing (SCPT) and Cone Penetrometer Testing (CPT) for geotechnical evaluation (lithol…
Replacing existing centrifugal switches for the 238-H Exhaust Fan A (53.001-A) with a new speed switch.…
The Tritium Facility desires to execute a project to design and implement physical security upgrades for 234-7H and 246-2H Vault Type Rooms (VTRs) …
Subcontractor will perform repairs to the roof on Bldgs. 773-43A and Bldg. 779-A.…
This activity details the general operation of the FormLabs SLA resin 3D printers (Form2 and Form3 variations) along with the post-processing tasks…
This project is to synthesize nanoscale sodium titanates and then load them with gold ions for the University of Washington. Collaborators at the U…
This activity involves disassembly and removal of 12 Lektrievers and 66 Space Saver racks in 704-1N.…
The EEC covers the renovations to the interior of building 717-3N.…
The EEC covers the renovations to the interior of building 711-1N.…
The Defense Waste Processing Facility Shielded Canister Transporter Uninterrupted Power Supply has been in service since 2017 and it is degrading a…