Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…
Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…
The Level Transmitter is being changed to a contactless radar.…
Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…
Four Handi-Houses located in the K-Protected Area (2) and Limited Area (2) are to be staged outside of K-Area and delivered to SRSCRO.…
This activity covers the tasks of receiving 7A or Croft SafDrums containing nuclear material from the K-Area Complex, unloading the shipping contai…