This EEC covers analytical methods for Radiochemical Measurements. This revision includes new chemical being added.…
Paint 905-108H MCC and replace structure sign.…
Floor tiles and metal cabinets will be replaced in lab 210 at the SREL main laboratory building, 737-A.…
Temporary Modification (234H-TMC-22-333) to route HAOM Inert Compressor to process sewer drain leading to H-2 Outfall.…
Due to high OCN rates over several years of operation, replace the existing Room 41 GS Oxygen Monitor (MSA Toxgard model 485950) with a new device …
Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…
Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…