A crack/hole in the 216-C Sump wall at the -40 level will be sealed. There is an ongoing leak from this location at this time.…
The instrument air compressor in Building 292-2F will be removed and replaced with a new "like for like" air compressor.…
New electrical service equipment is needed to support the National Atmospheric Deposition Program located outside bldg 623-28N.…
Due to a catastrophic leak on October 13, 2022, the Air Handling Unit (AHU) F-226002-HVAC-AHU-RTU1 discharged all R-22 refrigerant.…
SRNL has been tasked with examining how various forms of mercury can migrate through the solvent extraction system at Salt Waste Processing Facilit…
Study the behavior of materials of interest under induction heating, including the effect of adding nanoparticles, microparticles and macroparticle…
Temporary Modification No. DWPF-TMC-22-001 will be installed to upgrade the Defense Waste Processing Facility Main Process Cell Crane Communication…
A 9975 package is being heated to a temperature of up to 250F with external and internal heaters.…
Gas phase Molybdenum Hexafluoride (MoF6), CO2 and water samples will be condensed on a diamond slide and studied using the Helios femtosecond trans…
Revision 1: Dismantlement and Removal (D and R) of the Electrostatic Precipitators and connections attached to the 484-D Powerhouse…