Replace walkway (footbridge) at 645-4N.…
Pour new concrete pad at 713-N roll-up door.…
The 711-4N Lead Melter Complex includes a lead melter (10,000 lb) and supporting structures (dress-out hut, machining/tooling booth, material stora…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
A Composite Lower Flammability Limit (CLFL) Monitoring Station is being installed on Saltstone Disposal Units (SDU) 3A and 3B.…
Subcontractor will provide roof repairs at 704-52E / 704-53E. The Subcontractor “will” disturb the existing roof while performing these repairs on …
Rev 1. Revision 1 will also cover the sealing of the culvert adjacent to the paved area as well as the culvert across the fence at SRMC which were …
Construction will remove asbestos insulation around valves CAR-C-085 and -083 to allow for maintenance activities. Asbestos insulation will be disp…
Subcontractor will provide a roof replacement at 713-2N. The Subcontractor “will“ disturb the existing roof while performing this roof replacemento…
Small samples (less than 100 mg) of porous aluminosilicate zeolite material are analyzed in an Autosorb iQ gas sorption analyzer manufactured by Qu…