221-33F Install concrete bollards around exterior tank.…
Subcontractor will provide a roof replacement at 713-3N. The Subcontractor “will“ disturb the existing roof while performing this roof replacement …
Propane supplied from the Flammable Gas Distribution System (FGDS) is no longer required throughout the facility and is only required for operation…
DOE has excessed four (4) carpool sheds to the SRSCRO. The intent is that these will be dismantled and removed to off-site for re-use and/or resale…
Install outdoor PA speakers per attached work instructions in 703-41A, 703-42A, 703-43A, 702-2A, 730-4B, 711-1N and 706-N. Revision 1 needed to add…
704-C Install 2 outdoor covered picnic dining tables.…
Clean and apply Cool Seal coating to roofs of Trailers 704-31E, 33E, 37E, 47E, 49E, 50E, 51E, 66E Trailers 704-46E, 704-60E, and 704-73E added on R…
Repair water leakage into room 1029 in 766-H.…
645-2N Floor and wall painting.…
Overflow liquid from the recycle sump waste encasement is assumed to be leaking into a breeched section of the 6” as-built abandoned and capped und…