Stationary Air Compresssors powered by Diesel Generators (RICE) that failed are being replaced with comparable air compressors.…
Replace all wood on the LAWV Cell openings and coat with a wood sealer and wood behind gutters as necessary.…
703-A Install a board across multiple broken windows.…
Subcontractor will provide roof drain replacements at 722-4A.…
Non-rad metal-organic framework (MOF) surrogates will be prepared to simulate and increase understanding of actinide-containing MOFs (to be produce…
This activity pertains to the preparation of sintered fly ash sponge components for utilization with offgas testing in support of the Mobile Melt C…
Restroom trailer 773-71A, built in 1993, 478 square feet, will have services disconnected, and the trailer will be removed to the SRSCRO N-realaydo…
Install a Double-Wide Trailer (New Structure Number 704-75E) in E-Area.…
CO Monitor Calibration PM of the Compressed Air Purification System in 108-1L.…
There are currently multiple work orders for BlueMax application in these facilities, so this EEC is intended to allow the generic use of the BlueM…