Caustic dissolution of alum-inum metal is to be studied to support fuel target processing.…
Confinement ventilation in the Materials Test Facility (MTF) building 234-7H is maintained by the existing H-Area Old Manufacturing (HAOM) building…
Design and Procure a new and more reliable TCON Process Chillers for Building 233-H. The existing two TCON process chillers shall be Dismantled and…
Design and Procurement of Replacement Glovebox Oxygen Monitoring Alarm Panel in the Central Control Room of Building 233-H.…
Isolation and removal of HAAS VF 5XT Lathe (DOE 011810) from Building 226-2F to Building 711-1N for storage until lathe is needed in the 717-F mach…
Evaluate/correct a brine solution leak at V-2261 in the chill water line for the office air handling unit at HB-Line soft structure.…
Mobile melt consolidation is working with NNM and DOE headquarters to develop processes for disposition of nuclear materials by melting into stainl…
Isolate the hazardous energy in southern portion of 735-A, C-Wing.…
Melt cell high pressure sodium (HPS) light replacement with LED light for increased visibility.…
This activity involves the removal of piping associated with the abandoned surge tanks along the River Water Pumphouse Distribution System.…