Paint piping at 905-53A.…
Establish 9 new vadose zone lysimeter stations in E-Area around the perimeter of ET3, ST8, and ST9.…
Repair holes in the drywall inside the stairwell at 717-F.…
The DESC Switchyard at the 681-3G River Pumphouse is being rebuilt due to aging equipment and current site needs.…
Gas phase UF6, MoF6, CO2 and water samples will be condensed on a diamond slide and studied using the Helios femtosecond transient absorption spect…
Safety items in H area (outdoors) will be repainted due to fading due to sun exposure.…
Isolation and removal of several pieces of equipment originally used by MOX from Building 226-2F to Building 717-F or to Building 711-1N for storag…
Conference Room 32 in Building 234-H is going to be equipped with TV and Projector. The installation of two receptacles is going to be used to powe…
Review of Work Order tasks 1949521-01, Remove Asbestos Floor Tiles in 234-H, Rm 222 and 1950583-02, Remove/Replace Floor tiles and Paint Walls in 2…
The Furnace 100 Process Chilled Water has been shown to be overly acidic for its process function and needs to be drained.…