A domestic hot water line in 773-A, Room A-1132 is cur- rently leaking, PA is to replace the leaking section of pipe.…
The overall scope of this R and D activity is to carry out organic reactions to later be used in developing new semiconductor materials. Organic mo…
Removal of the above ground cathodic protection system components on the TF to SS LAWTL as recommended in E-EPF-Z-00001 and E-DCFZ-475.…
The scope of this activity covers the initial assembly, test setup and operation of the helium (He) leak detection equipment and instrumentation fo…
The AbrasiMet M Saw will be used to section metallurgical samples (steel, stainless steel, aluminum) for support of R and D programs.…
Rev. 6 : No ash is planned to be moved at this time. SCDHEC clarified to SRS that the excavation/movement of ash is not required to demonstrate ope…
Interior surface of Safety Class (SC) concrete wall under the steam condensation pipe at the eastern end of the 281-1H Delay Basin shows exposed ag…
The scope of work is to lay a 2” thick (min) layer of 9.5 mil asphalt mix with a non-woven geotextile underlayment applied over a tack coat over th…
The South Carolina Department of Transportation (SCDOT) will replace the existing bridge on State Road 66 (Rocky Point Road) over Lower Three Runs …
The Defense Waste Processing Facility (DWPF) is switching from Formic Acid to Glycolic Acid within the process. As such, Formic Acid is no longer r…