Cell Covers for underground locations at 105-C such as the Storage Tank Room, Heat Exchanger plugs will be cleaned and resealed. This is a routine …
Install Copper Cable and Fiber Optic Cable to 727-5N.…
Remove a section of the ductwork, metal duct tray and supports in 711-N IronWorkers Shop.…
Perform pinch welding activities on stainless steel, titanium alloys and aluminum alloys. The pinch weld process is a solid state welding process t…
Legacy research materials in 737-A, 772-25B, and 737-G will be inventoried, characterized, and disposed of accordingly. Transportaion of material t…
The Savannah River Ecology Laboratory (SREL) is conducting ecological studies of terrestrial aquatic connections in wetland and riverine ecosystems…
703-46A Correct Storm Water Intrusion.…
SRNS Emergency Management will install two new tornado shelters in B-Area. The new structure numbers will be 707-66B and 707-67B.…
Road 4 (2.8 miles) will be milled 2-1/2", paved with 1" Open Graded Interlayer (OGI) and 2" of asphalt, striped with thermoplastic and edge of road…
CM 4111: Light fixtures in 725-1N near can crusher are no longer working. Due to age and obsolescence, the 3 Metal Halide Low-Bay light fixtures in…