The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in B…
Design and install a new Digital Imaging and Measurement System (DIMS) to be installed in Room 28 of Building 233-H. It will be installed on a tabl…
Troubleshoot and repair indoor lights at 704-N.…
A pH electrode will be used to determine the pH of solutions. Chloride and Fluoride concentrations will be determined via ion specific electrodes.…
The objective of this study is to better understand the mechanisms of strontium sorption in aquifer sediments.…
Clearing of forested area near 703-B running track.…
Engineering Standard 15888 requires the change of HEPA/pre-filters. Maintenance will perform the seven year PM to change HEPA and prefilters.…
There is a sodium nitrite "jelly-like" blockage in the heel of the Sodium Nitrite Feed Tank located on the third level of 221-S. The blockage is pr…
709-1G Install power drop.…
The proposed activity prepares building 782-1M for deactivation by removing all electrical energy from the structure.…