Temporary Modification (234H-TMC-22-333) to route HAOM Inert Compressor to process sewer drain leading to H-2 Outfall.…
Due to high OCN rates over several years of operation, replace the existing Room 41 GS Oxygen Monitor (MSA Toxgard model 485950) with a new device …
Move 16.3, 18.3, PVV Controls from 17.2E Evaporator PLC to DCS at H-Canyon.…
The installation of a new guardrail system will provide fall protection from the edge of the roof for workers in the area or those passing by.…
Repair and-or replace impacted room features following ARGUS installation in 701-1K and 701-2K.…
Replace the door and existing hinges for Door 338 in 105-L.…
Mitigate contamination migration on the RBOF Cask Pad.…
The Level Transmitter is being changed to a contactless radar.…
Remove flanged spool piece and replace with ball valve on the TRU Pad 6 sump recirculation piping system.…
The purpose of this EEC is to document the placement of a grout plug into the 6 in abandoned process sewer drain pipe riser to prevent additional i…