This EEC covers the trouble shooting and repair of Welding Exhaust Fan No. 2 at 717-3N.…
Install 2 CNC Machines for Advanced Engineering Group, Bldg 723-A, Room 161: (1) Install HAAS ST-20 CNC lathe and provide power and compressed air …
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self-contained low powe…
Modify Plant Airline and install equipment in 717-F machine shop…
BSRA proposes to construct and operate a Non-Radiological Laboratory Center in A Area at the Savannah River Site (SRS).…
This EEC covers various general renovations for Building 735-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…
This is a collaborative study with USFS and University of Wisconsin. This research will allow USFS to better understand the relative ecological eff…
P41 Caustic Pump and Piping Electrical Heat Tracing and Freeze Protection…
In support of Effluent Treatment Facility (ETF) and Saltstone facilities being combined into a single organization called End Stream Delivery (ESD)…
This EEC will cover work associated with the replacement of the cipher lock on fire door 312 in 221-H room 308 and the crash bar if necessary.…