SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offiste …
Laboratory 141 and 193 of the 999-2W facility will be used to perform general chemical and nanomaterials research support for a variety of DOE-rela…
The EEC covers the painting of exterior doors, sealing and coating of the base of south east corner of building 717-26N.…
Fire Alarm Panel Replacement in 681-17N.…
Subcontractor will repair roof at 713-1N.…
Toilets Removal/Replacement in K-Area Restroom Trailers.…
Re-lamping in 105-K…
Subcontractor will provide roof repairs at 704-H. The Subcontractor "will not" disturb the existing roof while performing these repairs on 704-H.…
Install ice machines in the 1st and 2nd floor kitchens at 730-B. This will require cabinet and countertop modifications.…
Paint exterior areas at 784-3A.…