K-Area Purification (105-K) Bathroom Vanity Replacement, Walls Prep and Paint.…
717-F Replacement of the Annex 20 Ton HVAC Unit.…
730-B Install Windowsill sealant in conference room 117.…
Subcontractor will perform a roof repairs on 703-5B. The Subcontractor "will not" disturb the existing roof on 703-5B.…
Installation of VTC in 730-1B Rm. 329.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Refurbish Office Trailers 742-G through 742-5G.…
The Soil Vapor Extraction Unit (SVEU) at A-Area Burning Rubble Pit has been abandoned in place. The SVEU has been disconnected electrically and mec…
Fuel-cell style membranes will be used to evaluate hydrogen isotope separations. Hydrogen/deuterium (pure or mixtures) will flow on one side of the…
The purpose of this project is to test coal ash obtained from SRS for leachability with the end goal being potential beneficial reuse.…