The common copper service water header in 784-7A is being replaced with PVC piping. This activity is being performed to minimize the potential risk…
Deteriorated ACM (Asbestos Containing Material) window glazing will be removed and replaced at 760-11G.…
Subcontractor will provide roof repairs at 211-42H. The Subcontractor will not disturb the existing roof while performing these repairs on 211-42H.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181…
The flooring in 702-H will be replaced.…
50 Ohm Resistance Thermal Devices (RTD) shall be replaced with100 Ohm Platinum RTDs. Associated Recorder shall be reprogramed to accept the new 10…
Water Monitoring Equipment Deployment in F and E Area Basins…
There is one approx. 35 cu ft, non-flammable Nitrogen Compressed Gas (cylinder) that was part of a night vision purge kit. We plan to vent it.…
Isolate and remove 704-Z clean air handling units.…
Isolation and removal of HAAS TL-3 CNC Lathe (DOE 011809) from building 226-2F to building 717-F machine shop. Preparation includes, but is not lim…