The objectives of this project include four project workstreams: (1) Advanced Monitoring, (2) Steel and Wood Pole with Fire Mesh Upgrades, (3) Micr…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to approve an interconnection Delivery Point (DP) request from Tri-S…
Pre-construction due diligence, permitting, and acquisitions in support of construction of a new 138kV transmission line and rebuild existing 138kV…
Bonneville Power Administration (BPA) proposes to upgrade the perimeter fence and install new electronic security systems at Monroe Substation. The…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to upgrade Rifle Substation in Garfield County, Colorado. The purpo…
The project consists of the construction of new transmission lines, the rebuild of existing electric transmission lines, construction of a new elec…
East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the heating, ventilation, and air conditioning (HVAC) sy…
The objective of this project is to enhance grid reliability, power quality, grid resilience, and increase efficiency through advanced technologies…
CX-035789: Building a Resilient Grid to Mitigate Effects of Extreme Weather in North Central Florida
1. Deploy substation transformers, 2.Replace circuit breaker, 3. Install network reclosers along with their accompanying controllers and Remote Ter…