Replace overhead power distribution conductors and supporting poles and equipment as required to meet current codes and construction standards. Exp…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
(1) hardening or undergrounding of over 950 distribution poles, (2) hardening 57 transmission spans, (3) installing Fault location, isolation and r…
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable to facilitate the interconnection of One Energ…
Southwest Power Pool (SPP) issued a Notice to Construct to rebuild 4 miles of WAPAs existing 115kV transmission line from Gavins Point Substation t…
No. 1: Replacement of the control house, substation control and CT cabling and conduits between the relay house and field devices, substation relay…
Southwestern Power Administration proposes to rebuild 12.1 miles of 161kV transmission line from Liberty Substation near Liberty, Oklahoma to the V…
This project will replace and upgrade aged recloser equipment between the 69kv interconnect line and the hydroelectric dam.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to approve an interconnection Delivery Point (DP) request from Tri-S…
Bonneville Power Administration (BPA) proposes to rebuild an approximately 3-mile-long segment of the White Bluffs to Richland No. 1 115-kilovolt (…