Categorical Exclusion Determinations: B4.11

Project would convert the existing Burbank Water and Power 4 kilovolt (kV) electrical distribution system to a 12 kV system to deload existing 4 kV…
This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…