KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…
Recipient intends to use federal funding to install Gang Operated Air Break (GOAB) switches in its existing substations identified on the accompany…
Duke Energy Ohio proposes shovel-ready transmission and distribution improvements and energy storage initiatives for its service area. These projec…
United Electric Cooperative (UEC) will perform field installation of 16 overhead reclosers across their service territory in Minidoka and Cassia Co…
Raft River plans to upgrade 44 three-phase overcurrent protective reclosers and 14 single-phase overcurrent protective reclosers in and near variou…
Bonneville Power Administration (BPA) proposes to install connectors between structures 8/2 and 8/3 of the Boardman-Alkali No. 1 transmission line …
Recipient intends to use federal funding to mechanically clear trees and brush within its Clinton West distribution circuit right of way, in Clinto…
East River Electric is building the Moody County Switching station on WAPA's Flandreau - Sioux Falls 115 Kv transmission line between structures 40…
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Mason PUD 3 is upgrading it's Pioneer Substation from a 25 MVA unit to a 40 MVA unit along with new relay panels that will allow higher electric lo…