The 3 EQs associated with this CX entail the removal of dead vegetation within 3 separate spans of the subrecipient's service territory. …
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
Task 6 involves reconstruction and partial relocation of two 115kV transmission line segments. One 2-mile segment, and one 8-mile segment. Task 11 …
Bonneville Power Administration (BPA) proposes to update existing BPA electronic equipment and programs at Umatilla Electric Cooperative's (UEC) sw…
Bonneville Power Administration (BPA) proposes to upgrade the ground mat at Grand Coulee substation's 230-kilovolt (kV) switchyard and install fibe…
Project RELIEF will deploy advanced high-temperature, low-sag (HTLS) conductors on 250 miles of transmission lines, leading to 2x capacity increase…
Replace/Install Catalytic Converter/Muffler on 2 Nordberg duel-fuel generators.…
Bonneville Power Administration (BPA) proposes to expand the existing La Pine Substation near La Pine, Oregon to accommodate installation of three …
The Proposed Action includes a proposed powerline extension that would be partially located on U.S. Department of Energy/National Nuclear Security Administration property and partially located on Los Alamos County (LAC) property to provide reliable and redundant power.
EECA proposes the dedication of three acres for the construction of a new electric substation. The site would require perimeter fencing. Site is i…