East River Electric is building the Moody County Switching station on WAPA's Flandreau - Sioux Falls 115 Kv transmission line between structures 40…
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Mason PUD 3 is upgrading it's Pioneer Substation from a 25 MVA unit to a 40 MVA unit along with new relay panels that will allow higher electric lo…
Bradford Township replacement of existing Electric Substation facility will include excavation of a grounding grid, poured cement piers for substat…
Substation Modification - Installation of Advanced Power Flow Controller.…
Bonneville Power Administration (BPA) proposes to install new media converters, fiber, and appurtenances at the patch panel inside of BPA's existin…
Doniphan Electric Cooperative will completely rebuild the Blair substation. A full project narrative is also attached, which provides additional de…
Bonneville Power Administration (BPA) proposes to have BPA-owned substation equipment removed from Nevada (NV) Energy's Winnemucca Substation in Hu…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
The projects will require clearing and grubbing of forested areas totaling approximately 1-2 acres followed by grading to construct a 1 MW Battery …