Replacing AMI equipment within the fence of an existing distribution substation, or creating a trench within the existing electrical substation to …
Upgrades to existing HECO substations, including feeders, breakers, and 46 kV underground electrical distribution backbone to accommodate Joint Bas…
Construct a new 20 MVA 161/13kV substation on an existing substation lot.…
Replace all electromechanical substation relaying with new electronic protection and control devices at the existing North Philadelphia Substation …
Replace 3, 2800V Circuit Breakers at substation.…
Bonneville Power Administration (BPA) proposes to construct the new 500/230-kilovolt (kV) Sixmile Canyon Substation. Sixmile Canyon Substation woul…
The objectives of this project include four project workstreams: (1) Advanced Monitoring, (2) Steel and Wood Pole with Fire Mesh Upgrades, (3) Micr…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR) proposes to approve an interconnection Delivery Point (DP) request from Tri-S…
Pre-construction due diligence, permitting, and acquisitions in support of construction of a new 138kV transmission line and rebuild existing 138kV…
Bonneville Power Administration (BPA) proposes to upgrade the perimeter fence and install new electronic security systems at Monroe Substation. The…