The proposed project includes the construction of five 138 kilovolt (KV) transmission lines totaling 3.5 miles of new 100-foot right-of-way (ROW) and the rebuilding of approximately 0.4-mile of existing 100-foot 138 kV transmission line ROW.
The Proposed Action includes a proposed powerline extension that would be partially located on U.S. Department of Energy/National Nuclear Security Administration property and partially located on Los Alamos County (LAC) property to provide reliable and redundant power.
Bonneville Power Administration (BPA) proposes to install electronic equipment and fiber optic cable at Boardman and Morrow Flat substations, rebui…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The subrecipient proposes to underground overhead electric distribution lines and facilities in strategic areas located within its service territor…
MEC plans to upgrade approximately 14 three-phase sets of Oil Circuit Reclosers (OCR) to three-phase Dielectric Reclosers at several substations in…
Bonneville Power Administration (BPA) proposes to replace and update electrical equipment at the existing Monroe Substation located about 3.2 miles…
Bonneville Power Administration (BPA) proposes to remove the three suspension assemblies on existing structure 19/1 on the Sammamish Maple Valley N…
Subrecipient proposes to make improvements to the controls on its existing electric distribution system. A complete description is found on p.2 of …
Activities will include the proactive replacement of at-risk, aging, critical electrical infrastructure. Specific activities will include substatio…