CX-036387: TERAS (Tribal Energy Resilience and Sovereignty) Project

Construct up to 3 nested microgrids, with up to 1.4 MW / 2.54 MWh of energy storage, up to 0.75 linear miles of 12kV conduit and wire, up to 4 line…

Office of NEPA Policy and Compliance

August 28, 2026
Estimated Read Time   min

Construct up to 3 nested microgrids, with up to 1.4 MW / 2.54 MWh of energy storage, up to 0.75 linear miles of 12kV conduit and wire, up to 4 linear miles of broadband fiber, with vaults and related equipment on Trust lands of the Blue Lake Rancheria Tribe in Humboldt County, CA.