The Hot and Cold Nitrogen System will be purged with nitrogen first and then with Air Compressors.…
Planned activities consists of additions or modifications to electric power facilities within previously disturbed or developed facility areas,incl…
Cask and railcar maintenance on 70 ton and other casks going from L-Area to H-Canyon.…
Repair/Maintenance activity needed for Building 707-10F.…
Install WiFi service at 735-B.…
Remove space savers in Room 1001A at 730-4B per Acknowledgement of Scope.…
Repair damaged insulation on chilled water lines near 785-6A.…
AM and DO is planning to apply crusher run at Old Excess Yard in N Area for additional D-level storage/refurbishments.…
Bonneville Power Administration (BPA) proposes to replace two woodpecker damaged wood pole structures and associated structural/electrical componen…
The Kesselring Site Bathroom Refurbishment and Lactation Room Project will convert two (2) existing rooms into lactation rooms and refurbish bathrooms throughout the Kesselring Site (KS) ensuring the restrooms meet code requirements and function properly for a professional environment.