713-1N Replace east personnel door, threshold and emergency door rim device due to normal wear and tear and replace personnel door/awning located o…
Remove HVAC pad and add parking space at 731-N.…
The purpose of this work is to install a cooling tower water treatment system at the Central Utility Building (CUB) that will not use any hazardous…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform routine maintenance activities and custodial services for buildings, structu…
Sub-recipient will use contracted crews to inspect electrical poles and overhead wires within the sub-recipient's right-of-way and remediate vegeta…
Building 716-2A has a conventional Gamewell fire alarm system that requires a maintenance action to replace the existing conventional duct smoke de…
This Acknowledgement of Scope provides for the repainting of the crosswalks located between building No. 221-33F and building No. 717-F.…
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to segments of the Big Eddy-McLoughlin No …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the County of Carlton to design, develop, and i…
DOE-LM is proposing to conduct routine long-term surveillance and maintenance (LTS and M) actions at the Split Rock, Wyoming, Disposal Site located…