Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…
The scope of this work order is to clear the dirt and debris from the raceway trough near the South Steam Station. The conduits in the trough will …
Remove target system from Range 7 and prepare the area for installation of a new system.…
Administrative and project management activities, building construction, site excavation and preparation, concrete pad installation, equipment inst…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…
Repair 2 leaking roof drain pipes in 722-A. One is located over cube 131-F and the other is located in the radio shop room 130. …
Bonneville Power Administration (BPA) proposes to fund the Oregon Department of Fish and Wildlife's (ODFW's) routine operations, maintenance (O and…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
This project will replace end of life HVAC equipment with new ones. …
Repairing holes in sheetrock and painting the offices, Kitchen remodel, conference room Audio/Visual upgrades. Repairing water damage to offices du…