The Bonneville Power Administration (BPA) proposes to replace structure 21/6 on the Maupin-Redmond No. 1 transmission line with in-kind replacement…
Install WiFi service at 735-B and Install UW Drop in 735-B Room 132.…
Repair damaged domestic water (DW) line on north side of building 717-8N.…
Renovations to the Weapons Support Building (WSB) 236-3F to install Wi-Fi and universal wiring.…
Remove existing epoxy coating from 681-3G traveling screen deck and recoat.…
Cool Seal Roof 716-8B.…
Install WIFI at 735-2B.…
Vegetation management within Right-of-Ways. Thirty miles of copper conductor replacement. Replacement of electric poles. …
Replacement of approximately 90 wooden power poles with steel poles. Pole top covers are to be installed at various locations along with vegetation…
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …