The subrecipient proposes vegetation management to roughly 35 miles of urban circuits along the following: 1) 22 miles (out of the 35-mile circuit)…
Routine maintenance activities and custodial services for Building 292-F to include associated structures during which operations may be suspended …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 3-4, 4-8, and 27-4 on the Boysen-Pil…
The Nitrogen Vendor, Messer, will be repairing the West Tank and will temporarily hook up a portable Nitrogen system to provide Nitrogen to the TEF…
Remove 9 Tritium Charging Vessels from 233-H. The Tritium Charging Vessel's are an SRNL study to expose different sample stainless steel coupons to…
Security Subnode Cabinets and other enclosures installed under Project Y738 do not match the standardized design adopted by latest Tritium security…
Replace 784-7A walking floor base plates.…
Renovate interior of Building 703-B, including but not limited to flooring, wall coverings, fixtures, etc. Replace Door No. 3 and remove door No. 4…
Construction group will be renovating 704-H.…
Remove and replace broken floor tiles in 724-H.…