Bonneville Power Administration (BPA) is proposing to replace about 2 miles of existing fiber optic cable between Raymond Substation and the Raymon…
751-1A Roof repairs. The subcontractor will not be disturbing the existing roof while performing the repairs.…
Replace 285-13H chorine analyzer for process cooling water system.…
Install a Retrofit Single-Ply 60 mil Thermoplastic polyolefin (TPO) Roofing System on Building 705-N.…
The current deionized water system does not produce the quality of water that can be used for analytical chemistry methods in lab 270.…
Currently, the electrical distribution system for 234-H is near end of life. Changes to the electrical distribution system are needed to improve th…
Roof Repair at 704-53E.…
The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining parts for correc…
Prep/Paint 681-3G gantry crane, catwalk rails, and concrete curb.…
Evaluate / Correct Deep Well 905-107G.…