BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g., cross arms, insulators, guy ancho…
Northern California Power Agency (NCPA), a customer of Western Area Power Administration (WAPA), has requested that WAPA's line crew perform mainte…
Testing of the Consani Tanks is needed to support re-certification of the tanks as Industrial Package-2 (IP-2) shipping containers. This will allow…
Add Motor Starters to 772-F Courtyard for Cells A and B to provide the capability of removing liquids from LAD (Low Activity Drain) Tanks A and B.…
This EEC covers the modification a 20-foot-long Conex container at 717-3N.…
704-1N Replace flooring in rooms 112 and 113.…
Re-paint the floor at 645-4N.…
As a risk reduction strategy, the hydraulically actuated valves are scheduled to be retrofitted to provide motor-operated actuation in lieu of hydr…
Replace the compressor on HVAC Unit No. 5 at 704-N.…
Install Keri Door in 704-1N Room 140.…