The 254-19H load bank is being replaced due to repeated failures.…
The steam preheating coils for the 234-4H air handling unit (HVAC-AHU-53.006) have been damaged due to water hammer leading to the replacement of t…
Repairs to be made to wiring, conduit, etc. for electrical connection to sump pump, K-Area.…
BPA proposes to perform routine access road maintenance and reconstruction between Chief Joseph substation and Monroe substation in the 86 – 105-li…
The U.S. Department of Energy (DOE) plans to deactivate, demolish, and disposition ancillary small structures, piping or equipment, and tanks at the Paducah Site that supported the former uranium enrichment facilities and are aging and/or deteriorated, and no longer needed.
Agitators are being added to the Saltstone Dry Material Premix Screw Feeder Inlet to aid in transfer of dry materials…
L-Area facility has certain evolutions that are considered minor maintenance. To streamline the work evolution process, the facility would like to …
Replacement of the 221-F Canyon roof to fix water intrusion into 221-F. Conduit, piping and walkways will be removed to effectively replace roof.…
The subcontractor shall furnish all labor, tools, equipment, materials, consumables, services, transportation, storage, and supervision required fo…
Bonneville Power Administration (BPA) proposes to upgrade the physical security system at BPA’s Olympia Substation to support NERC CIP-006 and CIP-…