This activity is for the modification of AHU-53.004 (Air Handling Unit) currently located in a Laydown Yard Southeast of 763-52N.…
This scope is for installing storage shelving and removing existing storage cabinets from room No. 153 in Building 731-N.…
Insulate domestic water line above restroom in Bldg. 717-8N.…
These work activities are associated with the electrical repairs/upgrades to building 717-3N.…
Grind concrete floor to assure proper operation of the installed room divider at 705-3C room 134 per AOS work request 00841143.…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor.…
The Hand Geometry Units (HGU) for access to 703-42A requires replacement. The ability for designated qualified personnel to access their work space…
The scope of the activity is to recoat the interior and exterior of the 682-G elevated domestic water storage tank.…
Scope includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protecti…
BPA proposes to perform repairs and improvements at four locations where slopes have failed and are currently preventing equipment access to transm…