Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management around its Flaming Gorge S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to clean out accumulated sediment from the spill containment basin …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance on the existing drainage ditch and a…
Western Area Power Administration (WAPA) proposes to construct a new Point of Interconnection (POI) at the existing Denison Substation to accommoda…
The Salt River Project (SRP) is proposing to build a new double circuit 69-kilovolt (kV) transmission line near Ray Road in Section 30, Township 1 …
Bonneville Power Administration (BPA) proposes to conduct routine maintenance on access roads providing access to electrical transmission infrastru…
Evaluate / Correct Deep Well 905-20A.…
The scope of this work is for the raising, replacement, and removal of the ceilings in rooms No. 189 and No. 190 in building No. 742-A.…
Repair/replace a broken or damaged conduit at fuel station (715-F). The signal wire is broken somewhere in the conduit. The conduit is embedded in …
Warehouse awnings will be replaced at 731-1N, 731-2N and 731-3N. New downspouts will be installed with the new awnings.…