Bonneville Power Administration (BPA) proposes to replace structure 1/5 on the Lapine-Fort Rock No. 1 transmission line with in-kind replacement of…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Install Video Teleconference (VTC) in 717-11A.…
This EEC is a revision of a previous EEC with a different prefix [OBU-H-2021-0225]. The PA is a redesign of the existing Glovebox Stripper blowers …
Hasp-type locks will be installed on interior doors in 221-F.…
Plugs (hatch covers) for underground locations in L-area (i.e, storage tank room, heat exchanger room, etc.) will be cleaned and resealed. This is …
Carbon dioxide monitor calibration/PM of the compressed air purification system in 108-1L. …
This project is to replace existing 6000 gallon liquid nitrogen bulk storage tanks on the 264-5H gas pad with 9000 gallon tanks, install new phase …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Vernal-Hayden (VN…
Bonneville Power Administration (BPA) proposes repairing and improving approximately 4.8 miles of shared USFS/BPA access roads for the Ashe-Marion …