Repair/replace roll up door at 618-G.…
766-H Install six dedicated receptacles for printers in room 2127.…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required to…
Replace cubes and carpet on 3rd Floor East Engineering Area of 730-4B. The old communications UW will be removed and new electrical and communicati…
Subcontractor will provide roof retrofit at 618-G. The Subcontractor will not disturb the existing roof while performing this retrofit on 618-G.…
This Project is to install an automatic wet chemical fire suppression system over the griddle and stove in 246-2H Breakroom, Room 108. Fire Protect…
B26-51, a conferencing center, is scheduled for an equipment upgrade. The project primarily involves replacing current technology with updated hard…
Bonneville Power Administration (BPA) proposes replacing a tap line switch on the Connell Tap to Benton-Scooteney No. 1 and installing a new wood p…
This Acknowledgement of Scope provides for the repair of the sheetrock and installation of an access door for the valve behind the sheetrock in roo…
Subcontractor will provide roof retrofit at 315-M. The Subcontractor "will not" disturb the existing roof while performing this roof retrofit on 31…