BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
The scope of work includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protection system anode strings. Piping shall be coated to the first flange above grade or as close to grade as possible (excluding insulated, galvanized, or non-metallic piping).
This project is for building an office inside of room 230 of building 704-4N.
The objectives of this project include four project workstreams: (1) Advanced Monitoring, (2) Steel and Wood Pole with Fire Mesh Upgrades, (3) Micr…
Construction to modify existing ice maker with a new bigger bin and install another new ice machine at 713-N.
Subcontractor will provide roof repairs at 704-32G.
This activity is for the Renovation of Tornado Shelter walkways (aluminum landings, modular ramp, concrete sidewalk). The renovations include walkways at the following shelters: 707-29F, 707-30F, 707-31F, 707-32F, 707-33F, 707-34F, 707-35F, 707-36F.
Subcontractor will provide roof repairs at 703-1B.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the generator at Sherman Hill Communication Site in Alba…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure and switch replacements on its existing Pilot …