This EEC covers the sealing and coating the roof and replacing the damaged door of the bathroom trailer at 718-20N.…
This work scope covers removing/replacing carpet at 704-N.…
731-1N Paint office and warehouse walls. This will include prepping and patching sheetrock and all doors, etc.…
Subcontractor will perform a roof replacement at 731-N. The Subcontractor "will" disturb the existing roof while performing this roof replacement o…
BPA proposes to remedy impairments, add overhead ground wire (OHGW), and improve access roads along the Libby-Bonners Ferry No. 1 transmission line…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management between structures 6 to13 …
B-Area trailers underpinning replacement.…
Replace carpet at 701-8G Barricade 8.…
Repair HVAC Unit No. 2 at 717-5N. Replace motor in the air handling unit at 717-5N.…
The addition of the two Tees on the Domestic Water line would allow for easy connection points if access to domestic water is needed. The Tees will…