Repair wall and door frame at 731-1N Room 134.…
Perform renovations to the wellness room at 731-N.…
Repair ceiling insulation at 731-3N warehouse.…
Existing sump failed and will be replaced with like-for-like sump pump. Drawings will be updated to show the current field condition in addition to…
Install Beaver Cone at 731-N basin.…
Western Area Power Administration (WAPA) proposes to repair the existing parking lot and road surfaces at the Bismarck Office, Bismarck Warehouse, …
Bonneville Power Administration (BPA) proposes to install a new 115-kilovolt (kV) power circuit breaker (PCB) and to complete additional equipment …
Bonneville Power Administration (BPA) proposes to perform in-kind replacement of thirty-six wood pole structures and associated structural/electric…
General renovation activities for Building 645-1N…
This work activity covers sealing the roof leaks at 711-9N.…