The HANM Primary Stripper 2 (P2) System has experienced several piping failures due to chloride induced stress corrosion cracking. In addition, hea…
This project would conduct a study of the current electrical system to identify power poles that are a hazard due to age and wear. Replacements of …
BPA proposes to improve grid reliability on 23 miles of the Chenowith-Goldendale No. 1 115 kV transmission line in Wasco County, Oregon and Klickit…
BPA proposes to fund the Oregon Department of Fish and Wildlife (ODFW) and the Jefferson County Soil and Water Conservation District (JCSWCD) (toge…
BPA proposes to update erosion and sediment control protections and replace existing damaged perimeter fence, install new medium security fencing, …
766-H Replace broken window.…
Subcontractor will perform a roof replacement at 731-1N. The Subcontractor "will" disturb the existing roof while performing this roof replacement …
BPA is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locations in BPA’s Bell and Kalispell d…
Administration (BPA) proposes to allow AT and T to upgrade its telecommunications equipment at its Redland South wireless site, located on structur…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…