741-1N Replace personnel door.…
The Tritium Extraction Facility (TEF) Instrument Control System (ICS) Process Control System (PCS) D/3 Distributed Control System (DCS) supports op…
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
C. E. Bourne Subcontractor 00000611 will provide roof repairs at 704-22G. The subcontractor will not disturb the existing roof while performing the…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road and transmission line right-of-way (…
LM is proposing to conduct Phases II and III of the Disposal Cell Cover Enhancement Pilot Project at the Rifle Disposal site to address the potenti…
The DOE Loan Programs Office is considering whether to issue a loan guarantee of a funding facility to Alabama Power Company pursuant to its authority under the Energy Infrastructure Reinvestment 1706 Program.
Bonneville Power Administration (BPA) proposes to conduct access road improvements along the Olympia-Grand Coulee No. 1 transmission line from mile…
Bonneville Power Administration (BPA) is proposing to replace Lexington-Longview No. 1 structure 9/1 and any associated hardware and guys. The stru…
Bonneville Power Administration (BPA) proposes to excavate ground impairments on the Raver-Echo Lake No. 1 transmission line at two locations along…