General renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, painting, and electrical modifi…
Ultrasonic equipment is being installed in the Saltstone mixer that will be used to remove grout material that is adhering to mixer nozzle.…
Replace gutters at 713-N.…
Replace HVAC unit at 713-N Tool Room.…
Install new level transmitters for tank cells A, B, C and D to provide level monitoring and communicate back to the remote level monitoring system.…
Renovations to be performed in various offices in 735-B and 735-4B. Windows that are leaking will be repaired and sealed. Sheetrock will be patched…
This activity is to replace the 151-1C and 151-2C DC breaker panels due to age and normal wear over time. Note: Revision 1 is necessary to extend o…
In July 2025, WAPA completed CX Determination on acquisition of 2.07 acres of additional land abutting the north and east perimeter of Wessington S…
Upgrade Hood Circuits at 735-B…
Perform habitability repairs at 731-2N.…