Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor.…
The Hand Geometry Units (HGU) for access to 703-42A requires replacement. The ability for designated qualified personnel to access their work space…
The scope of the activity is to recoat the interior and exterior of the 682-G elevated domestic water storage tank.…
Scope includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protecti…
BPA proposes to perform repairs and improvements at four locations where slopes have failed and are currently preventing equipment access to transm…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…
The scope of work includes recoating interior surfaces, including ladders, floors, manways, roof hatches, vents, funnels, and piping, but not cathodic protection system anode strings. Piping shall be coated to the first flange above grade or as close to grade as possible (excluding insulated, galvanized, or non-metallic piping).
This project is for building an office inside of room 230 of building 704-4N.
The objectives of this project include four project workstreams: (1) Advanced Monitoring, (2) Steel and Wood Pole with Fire Mesh Upgrades, (3) Micr…
Construction to modify existing ice maker with a new bigger bin and install another new ice machine at 713-N.