The project will be targeting poles that are currently over 50 years old and have a transformer. In addition, priority will be placed on transforme…
The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired. There was no alternative available, because several sit…
Due to severe weather, there was a downed power line on Eola Rd that needed to be repaired.
Security Station 712 Building 09-023 is no longer functioning efficiently for Pantex Security. This project would consist of removing the existing …
BPA proposes to replace a deteriorating wood pole structure and associated structural/electrical components (e.g. cross arms, insulators, guy ancho…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA's Map…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.
BPA proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the Big Eddy-Ostrander No.1, Knight-Ost…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to address non-recurring …