Categorical Exclusion Determinations: B1.3

The proposed action would replace a portion of the existing overhead electrical power and fiber optic telecommunication poles and cables with buried cables along an approximately 3,583 feet long corridor extending from near the summit of Rattlesnake Mountain and downslope to the southeast.
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.