Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to allow Tri-State Generation and Transmission Association, Inc. (T…
The Kesselring Site Perimeter Roads Maintenance Project will rehabilitate approximately 11 miles of the Kesselring Site Perimeter Roadway System to include 6 miles of the perimeter loop road and 5 miles of spur roads.
Replace posts and cables that span Lower Three Runs and Four Mile creek bed. These cables support the flow tracking device used to measure stream f…
The Recipient proposes to develop and field-demonstrate low-cost and multi-purpose technologies for monitoring substation physical security while p…
Subcontractor will provide roof repairs at 645-10N.…
This EEC covers reconfigure ceiling in 717-5N to expose sprinkler system.…
Replace the old secondary 15kV cables on T1 transformer at 151-1C.…
M-DCF-H-13130, Revision 1 will replace two (2) existing flanged connections that currently have instrument tubing with solid blind flanges.…
Provide labor, material, and services to fallen trees and brush at six environmental monitoring station locations: Lower Three Runs (L3R) -1A, L3R-…