Construction to replace furnace exhaust pipes for heaters No. 42, No. 43, No. 44, and No. 46 in building 717-3N.…
Install metal roofing panels and reattaching metal trim on the roof of building 713-1N.…
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…
CM 4443 Install flashing on east end at 711-1N.…
Installation of 14 New Cubes in 704-1N Room 117.…
The Control Room C-041 Monitoring and Control System DCS in Building 773-A will be upgraded by replacing the existing Programmable Logic Controller…
Routine maintenance activities and custodial services for Building 772-F to include associated structures during which operations may be suspended …
Annual Trash removal service…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Chalkyitsik Power Plant Update - replacing 1 generator, repairing 1 generator.…