The project involves grading 11.35 miles of existing access roads along WAPA's Path 15 transmission line where they have become rough or developed …
Office of NEPA Policy and Compliance
February 11, 2026The project involves grading 11.35 miles of existing access roads along WAPA's Path 15 transmission line where they have become rough or developed rills or gullies in the roadway. Typical equipment for the project includes one road grader, one excavator, one dump truck, one small tractor with frontend loader and box grader attachment, one roller, water trucks, and a trailer to haul equipment.