Remove/Replace worn/damaged breakers in N-area lighting panels in multiple shop area buildings.…
Bonneville Power Administration (BPA) proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the G…
Bonneville Power Administration (BPA) proposes to move two structures between 100 and 110 feet Ahead On Line (AOL) on the Keeler-Forest Grove No. 1…
Bonneville Power Administration (BPA) proposes to perform maintenance on 400 feet of existing access road and transition approximately 5.6 acres of…
Bonneville Power Administration (BPA) proposes to relocate and remove structures on the Filbert Tap to Forest Grove-McMinnville No. 1 transmission …
Twin County EPA is proposing four integrated projects, reconductoring and constructing a 1.5-mile tie line between Refuge and Swiftwater substation…
The PA is a redesign of the existing Glovebox Stripper blowers under MT-TRI-2021-00017 Rev. 2. It redesigns the existing Glovebox Stripper blowers …
Replace and/or secure wall tiles at 736-A room 204.…
Install oil boiler fuel flow meter at 784-7A.…
Install copper cable to building 704-12B from manhole.…