Bonneville Power Administration (BPA) proposes to move two structures between 100 and 110 feet Ahead On Line (AOL) on the Keeler-Forest Grove No. 1…
Office of NEPA Policy and Compliance
February 2, 2026Bonneville Power Administration (BPA) proposes to move two structures between 100 and 110 feet Ahead On Line (AOL) on the Keeler-Forest Grove No. 1 and No. 2 transmission lines. Specifically, structure number 5/2 on each line would be moved.