BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g., cross arms, insulators, guy ancho…
Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …
LPO is considering whether to issue a loan guarantee of a funding facility to the Georgia Power Company (GPC) pursuant to its authority under the EIR Program.
Bonneville Power Administration (BPA) is proposing to replace two deteriorating wood pole structures and any associated hardware and guys at a loca…
The Bonneville Power Administration (BPA) proposes to repair fiber cable on the Grizzly – Captain Jack No. 1 transmission line between structures 1…
BPA proposes to reconductor and replace associated hardware along the Wautoma-Rock Creek No. 1 500 kV transmission line from miles 37 to 43. Replac…
The purpose of this plan is to implement a structured, phased approach to the safe and efficient disposal of scrap materials and waste stored at th…
BPA proposes to allow various telecommunications companies to upgrade their wireless network antennas and equipment at existing sites on BPA transm…
Bonneville Power Administration (BPA) proposes to apply fire retardants to select wood poles throughout the BPA service territory. The proposed wor…
Subcontractor shall provide all labor, materials, supervision, equipment and transportation required to perform a Differential Global Positioning S…