The project plans to perform vegetation management along a 22.2 mile access road with a Fecon Mulcher and an Excavator with a mulcher head barged t…
Bonneville Power Administration (BPA) proposes to remedy eight impairments along the Boundary-Sacheen No. 1 and two impairments along the Sacheen-B…
Overhaul of 40 year old bulb-type generator at the Reregulating Dam powerhouse facility.…
Bonneville Power Administration (BPA) proposes to allow Clean Water Services (CWS) to access BPA fee-owned Right-of-Way (ROW) to plant, manage, and…
Bonneville Power Administration (BPA) is proposing to complete urgent maintenance on the Schultz-Wautoma No. 1 transmission line as part of BPA’s w…
Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…
The scope of this work order is to clear the dirt and debris from the raceway trough near the South Steam Station. The conduits in the trough will …
Remove target system from Range 7 and prepare the area for installation of a new system.…
Administrative and project management activities, building construction, site excavation and preparation, concrete pad installation, equipment inst…
Handrails, anchor bolts and baseplates around L-Area (exterior) will be repainted to stop rusting. Other items may need to be painted such as bolla…