Categorical Exclusion Determinations: B1.3

The project plans to perform vegetation management along a 22.2 mile access road with a Fecon Mulcher and an Excavator with a mulcher head barged t…
Accumulated rainwater is to be pumped from the 607-1F primary sedimentation tank (rectangular basin) and sludge digestion (circular) tank to the 60…