CM 4443 Install flashing on east end at 711-1N.…
Installation of 14 New Cubes in 704-1N Room 117.…
The Control Room C-041 Monitoring and Control System DCS in Building 773-A will be upgraded by replacing the existing Programmable Logic Controller…
Routine maintenance activities and custodial services for Building 772-F to include associated structures during which operations may be suspended …
Annual Trash removal service…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Chalkyitsik Power Plant Update - replacing 1 generator, repairing 1 generator.…
Hose changeout in the 105-L Transfer Bay due to scheduled preventive maintenance or damage.…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA’s Bri…
Construction to repair HVAC duct at 731-5N due to storm damage.…