This Revision was created to extend the time period required for the open glovebox maintenance and include additional information on the expected r…
Replace Fire Alarm Panel at 784-7A.…
Subcontractor will provide roof repairs at 716-8B.…
This activity is to replace the 151-1C and 151-2C DC breaker panels due to age and normal wear over time.…
Central air supply Fan 47 has excessive vibration readings due to normal wear and tera and the shaft and bearings need to be replaced.…
703-A Evaluate/Correct broken glass in windows.…
Replace Halogen Floodlights on Range 1 at ATTA.…
UPC contractor to provide services to renovate building 704-82H.…
Install metal insulation and flashing over roof hatch on 773-A C-wing roof.…
Subcontractor will provide roof repairs at 710-14N.…