Categorical Exclusion Determinations: B1.3

The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to perform the work in connection with inspection, testing, and repairs of the Pond 7 (Brine Pond) and Pond 37 (Oil Recovery Pond) liner system.