Perform building improvements to process area at 782-3A.…
UMass Amherst plans to upgrade the campus's existing medium voltage electric distribution system through the installation of five Automatic Transfe…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N so Construction may replace the failed Rego manifold and test PRVs(P…
Restore Tank 709 level control to original design with new float style Kimray level controller (LC-415) in H Canyon.…
Subcontractor will repair 790-5B. The Subcontractor will not disturb the existing roof while performing these repairs on 790-5B.…
Subcontractor will repair 730-1B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-1B.…
Subcontractor will repair 730-B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-B.…
Insulate piping around M-1 air stripper valveNo. V-RWW003.…
Nitric Acid piping will be installed that provides a transfer path from Tank TK-106 to Tank TK-304. A High-High Level Interlock action to stop Pump…
Premix Air Blender No. 1 Dust Collector (Z-205000-BMH-DCOL-0004) is in need of repair due to brief pressure excursion during normal operation.…