Hose changeout in the 105-L Transfer Bay due to scheduled preventive maintenance or damage.…
Bonneville Power Administration (BPA) proposes to replace aging substation equipment and to reconfigure and expand the substation yard at BPA’s Bri…
Construction to repair HVAC duct at 731-5N due to storm damage.…
This activity involves the installation of external oil sampling ports on various electrical transformers throughout SRS.…
735-4B Floor replacement in Shield Rooms.…
Routine maintenance/replacement of overhead roll-up door at 731-2N.…
Engineering to inspect 291-F annulus and duct work within the breech house.…
EEC covers all maintenance activities performed by SRNL organizations that have the potential to disturb gasket and/or gasket-like materials in cle…
The proposed work activity is to drain three totes containing wastewater from the F-Canyon Railroad Tunnel Sump (RRTS) to the Effluent Treatment Fa…
Control room and restroom renovations at 681-3G.…