Remove legacy pressure relief valves from unused water heaters in domestic water system in 105-L, 108-1L, 108-2L and 704-L.…
Rad Monitor replacement at F and H Retention Basins.…
Add crusher run and grade as needed in storage areas and additional area at 713-2N.…
Remove/Reinstall 181 Drain Tank Outlet Valve and Replace Pump P-T181. This EEC is a revision to OBU-H-2024-00028 to extend the end date.…
Storm drain piping in 105-L will be replaced…
The Bonneville Power Administration (BPA) proposes to allow TCT Columbia Holdings LLC to use and improve existing BPA access roads and construct a …
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys at specific l…
The proposed activity is for site maintenance to drain all refrigerant from equipment in building 211-9F.…
Remove and replace damaged sheetrock and install access door for valves behind the wall at 709-7G. Prep and paint sheetrock.…
Replace and re-route the conductors used for the north side motor on TRU Pad 3 in E-Area. Remove the receptacles mounted to the south side of the P…