Subcontractor will provide roof repairs at 705-3C.…
Repair/replace missing pipe insulation at M-1 LT-061.…
Repair Leaks on Mark 18A (MK-18A) cask located in building 773-A shielded cells.…
LM is proposing to conduct non-remedy-related routine and non-routine activities associated with the maintenance and ongoing management of the Rock…
Replace 285-H supply pumps base shaft guards.…
Construction will prep and re-paint rusted cabinets throughout 735-B.…
730-B Evaluate/correct/repair skylight in lobby.…
Construction to replace furnace exhaust pipes for heaters No. 42, No. 43, No. 44, and No. 46 in building 717-3N.…
Install metal roofing panels and reattaching metal trim on the roof of building 713-1N.…
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…