Bonneville Power Administration (BPA) proposes to provide funding to the Washington Department of Fish and Wildlife (WDFW) to implement the Ringold…
The 105-C roof is leaking on 26 elevation between the CMA (Crane Maintenance Area) and Purification Areas. Rainwater is getting into the waste and…
Correct water intrusion at 713-1N.…
Bonneville Power Administration (BPA) proposes to replace the propane engine generators (EGs) that provide emergency power supply at three radio st…
The DOE Office of Energy Dominance Financing (EDF) is considering whether to issue a loan guarantee of a funding facility to the Georgia Power Company (GPC).
This categorical exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g., cross arms, insulators, guy ancho…
The Bonneville Power Administration (BPA) is proposing the replacement of structure 3/4 on the Forest Grove-Tillamook No 1 transmission line. The r…
Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…
ROW and easement clearance will take place approximately 12 miles from the Lovell Canyon turn off. This will consist of road construction and clear…