The proposed work activity is the replacement of the entire 772-4F.…
BPA proposes to repair about 3 miles of existing access roads and improve or replace 15 stream crossings along the Schultz-Raver and Rocky Reach-Ma…
Scope for instructions tab for all 3 tasks: Pressure switch for Fuel Pump 619-4N malfunctioned causing fuel oil to leak in the shop area at 717-3N.…
Activities include upgrading an existing CDR testbed facility, concurrent multi-pathway CDR testing, process modeling, data compilation and analysi…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine access road, right-of-way (ROW), and structure f…
713-2N Repair damaged high-bay building insulation that is torn.…
Paint exterior of spare 18" river water globe valve.…
Painting without stripping/sanding/scraping in L Area Complex.…
Upgrade PLC's (Programmable Logic Control), Control Panels and related infrastructure for the deionizer and sand filter in 105-10L to newer equipme…
Prep/Apply coatings to I-beam and place grout in storage room. …