Paint service water and river water piping at 681-3G.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Long House Valley…
Bonneville Power Administration (BPA) proposes to replace two temporary access road bridges located near structures 96/3 and 97/3 of the Chief Jose…
These work activities are associated with the electrical repairs/upgrades to building 717-3N.…
The P Reactor Discharge Canal (PRDC) flows through two culverts under H and 8 Roads. Woody debris has accumulated in and upstream of the culverts. …
The area upstream of NPDES Outfall H-12 is overgrown with vegetation and does not allow clear visual from the road. Vegetation was cleared and rema…
L-brackets will be bolted on to either side of staircase, then bolted to concrete block beneath stairs.…
Increase in 234-7H emissions to support Materials Aging and Characterization (MACs) life storage program until completion.…
Repair broken/leaking plumbing in K-Purification Area women's restroom.…
Perform roof repairs on the K-Area Materials Access Area trailer.…