Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to issue a license outgrant to a private landowner to petition for …
The proposed work activity is to remove HVAC metal frames from Building 221-F because they are falling apart and pose a safety hazard to personnel.…
The Purpose of this project is to repair and restore the Kennedy Pond Bridge (603-41G) embankments damaged due to scouring occurring at both abutme…
Installation of four (4) sidewalks at building 730-1B and building 730-4B. Installation of one (1) crosswalk at building No. 730-4B.…
Install Power supply at 717-F remote monitoring station.…
The expansion tank for the 218-H Chilled Water System is being replaced due to deterioration and the new model requires a minor modification of the…
BPA proposes to perform in-kind replacement of ten wood pole structures and associated structural/electrical components (e.g. cross arms, insulator…
Remove existing 125 VDC batteries and replace with new batteries at 681-3G.…
Repair 730-N storm damage.…
This EEC covers the sealing and coating the inside and outside around the base of building 717-1N (Boilermakers Shop).…