Bonneville Power Administration (BPA) proposes to maintain the existing access road network between line miles 1 and 14, and between line miles 30 …
Bonneville Power Administration (BPA) proposes to replace two temporary access road bridges located near structures 96/3 and 97/3 of the Chief Jose…
Bonneville Power Administration (BPA) proposes to improve and reconstruct existing access roads, construct new access roads, and correct conductor …
The Kesselring Site Reverse Osmosis System Overhaul Project will replace the current Reverse Osmosis (RO) system located inside the KS Boiler House with a new water purification system.
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Thermopolis-Badw…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), conducted emergency structure replacements on its existing Thermopolis-Lovel…
Corrective maintenance will be conducted in 233-H that may temporarily increase emissions.…
This activity covers installing new flooring in offices in building 711-9N.…
Replace 3 electrical supplied wall heaters in building 717-1N.…
Bonneville Power Administration (BPA) proposes to correct one impairment on the John Day-Grizzly 500-kV No. 2 line and improve and reconstruct an a…