Bonneville Power Administration (BPA) proposes to conduct routine maintenance on an access road that is between line miles 79 and 83 on the Dworsha…
Bonneville Power Administration (BPA) is proposing to replace about 2 miles of existing fiber optic cable between Raymond Substation and the Raymon…
751-1A Roof repairs. The subcontractor will not be disturbing the existing roof while performing the repairs.…
Replace 285-13H chorine analyzer for process cooling water system.…
Install a Retrofit Single-Ply 60 mil Thermoplastic polyolefin (TPO) Roofing System on Building 705-N.…
The current deionized water system does not produce the quality of water that can be used for analytical chemistry methods in lab 270.…
Currently, the electrical distribution system for 234-H is near end of life. Changes to the electrical distribution system are needed to improve th…
Roof Repair at 704-53E.…
The Saltstone Facility dry material dust collectors are to be replaced over the next few years due to being outdated and obtaining parts for correc…
Prep/Paint 681-3G gantry crane, catwalk rails, and concrete curb.…