Install new quad receptacles, light switches and replace existing duplex receptacles with quad receptacles.…
Demolition and safe removal of existing 69kV underground cable. Installation of new transmission cable, termination, and splicing. Construction of …
Mount a cabinet to the existing structure and install communication wiring/ conduit within the existing substation rock footprint (12 substations).…
Gate valve (GCAS-V-RWW315) for Tails Pump Suction Drain valve located at M-1 Air Stripper in M Area is leaking and needs to be replaced.…
Perform relamping and lighting repairs in Solid Waste Deactivation Management (SWDM).…
Paint and replace carpet at 703-46A per AOS work request 00840764.…
Replace exterior doors at 784-3A…
Replace lights and switches in building 763-141N.…
Seal exterior duct flashing on the East side of 731-3N.…
Repair the water hammer issue in the Truckers lounge restroom.…