This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Prep and apply Cool Seal to roll-up doors 1 and 2 at 705-C.…
Maintenance will replace the packing material in the M-1 Air Stripper Column.…
Evaluate, correct, and overhaul chiller No. 2 and return to normal working conditions in HB-Line.…
Bonneville Power Administration (BPA) proposes to replace in-kind, wood pole structure 10/6 and associated structural/electrical components (e.g., …
Bonneville Power Administration (BPA) proposes to remove, replace, or retire approximately 14 marker balls on the Schultz-Raver No.1/Schultz-Echo L…
Bonneville Power Administration (BPA) proposes to improve four water crossing features and to widen the access road to accommodate the water crossi…
Installation of fused disconnect to lower arc flash category of precipitator closet.…
Construction of new gravel parking lot in B-Area.…
The existing level transmitter is unreliable and causing numerous maintenance outages. It will be replaced with a radar sensor.…