The objective of this project is to clear vegetation and remove any trees that obstruct or pose a hazard to the G-10A Outfall, ensuring safe and ef…
Septic Tank Replacement at 709-7G. Revision 1 is to update the prefix (from OBU-G-2024-00017) and to extend the end date of the activity.…
Install WIFI at the 707-13B communications building.…
Install a level transmitter on the soda ash tank at 782-3A.…
Bonneville Power Administration (BPA) proposes to maintain low-growing vegetation communities in specific, localized areas in and adjacent to the …
Repair/Replace Wooden platforms and ladders as needed due to weather exposure.…
Install WiFi at 701-21G.…
Fire Sprinkler and Fire Alarm and Detection Systems for SRSFD Station No. 1 Sleeping Quarters Trailer 709-8G. Revision 1 is to include the new work…
Subcontractor will perform roof retrofit on 705-1C. The Subcontractor "will" disturb the existing roof while performing retrofit on 705-1C.…
DOE's Office of Legacy Management (LM) is proposing to conduct routine inspections, monitoring, and maintenance at the Rifle disposal and processin…