Targeted vegetation management. …
719-5N Renovate Drug Alcohol Testing Area.…
In an effort to meet the needs of the site, perform a camera conversion at 701-1A ECF.…
Subcontractor will provide roof repairs at 705-3C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-3C.…
Augusta Industrial to pump approximately 12,000 gallons of Hazardous Waste Oil into Clean Harbors Tankers at 184-2k.…
Remove waste oil from two 500 gallon containers (Container No. 8 and Container No. 9) at 716-4N.…
The scope of work for renovating Building 704-2H includes applying coatings to the walls, replacing the bathroom vanities, removing carpet, and ins…
Bonneville Power Administration (BPA) proposes to upgrade the perimeter fence and install new electronic security systems at Midway Substation.…
Bonneville Power Administration (BPA) proposes to remediate impairments along eight spans of the Lower Monumental-McNary No. 1 500-kilovolt transmi…
Approximately 1500 linear feet of 6-inch PVC domestic water piping with appurtenances shall be replaced. The domestic water line shall be replaced …